I.F.ITALY S.r.l.s Copyringht 2015 - Tutti i diritti riservati

 

 APPLICATION OF THE  ZR 80 SYSTEM  IN THE MASONRY

 

 

     During  the construction of your wall, the System ZR 80 must be installed on both sides of the opening (window or door).

    Proceed in the following order: The 1st and 2nd system ZR must be positioned over the first row of perforated bricks (in

    proximity of the opening of your window or door);

    Once installed the fourth row of perforated brick, position the 3rd and 4th ZR 80;

    Arrived to the seventh row of perforated brick, position the 5th and 6th system ZR 80

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

                                                                                          Positional

 

 

 

 

 VIA PREDABISSI, 2 - MILANO (IT) REGISTRO IMPRESE MI – 2051641
TELEFONO : + 39 02 400 39 515 P. I.V.A. - COD.FISC.: 08829690968